Storm Damaged Road Repair Projects, Palo Colorado Road, Monterey County, CA

A grassy wildfire in Monterey County in Summer 2016 resulted in four locations along Palo Colorado Road to be identified as potentially unstable and possibly impacted by the upcoming rain season, due to relatively steep slopes below the roadway. Wood Rodgers, Inc. (designer) was engaged by Monterey County for emergency repair work. PARIKH prepared geotechnical investigation services for the emergency work at the four locations. Borings encountered shallow roadway fill over decomposed and weathered granite, susceptible to erosion. Repair consisted of soldier pile retaining walls with tiebacks in the steep terrain. Design conformed to AASHTO LRFD specifications and Caltrans standards.

Project Details

DATE

2016 – 2017

OWNER

County of Monterey Resource Management

CLIENT

Wood Rodgers, Inc.

KEY PERSONNEL

Gary Parikh
David Wang

Project Gallery