Frank Wang PE, GE
Frank, a Principal at PARIKH, joined the firm in 2001 and has 22 years of experience on public works projects throughout California. Frank is responsible for planning, performing/overseeing engineering analyses, and preparing reports. He has extensive experience in transportation and transit projects, including bridges, earth retaining structures, public buildings, and pavement design. His project experience includes:
- Storm Damage Road Repair Projects, Santa Cruz County, CA
- Skyport Drive Grade Separation San Jose Airport, Santa Clara County, CA
- VTA’s BART Silicon Valley Berryessa Extension (SVBX), Alameda and Santa Clara Counties, CA
- Route 12/Jameson Canyon Road Widening Project, Solano and Napa Counties, CA
- I-80/I-680/SR 12 Interchange Project, Solano County, CA
- 11th Street East Tracy Overhead Replacement Project, Tracy, CA
- BART Earthquake Safety Program, Alameda and Contra Costa Counties, CA
- Peninsula Corridor Electrification Project, San Francisco, San Mateo, and Santa Clara Counties, CA
- California High-Speed Rail, Construction Package 2-3, Fresno, Kings, and Tulare Counties, CA
- Crenshaw / LAX Transit Corridor, Los Angeles County, CA
- Purple Line Extension, Sections 2 & 3, Los Angeles County, CA
Credentials
EXPERTISE
- Geotechnical Engineering
- Rail/Transit
REGISTRATION
- Civil Engineer, CA C-67751
- Geotechnical Engineer, CA GE 2862
EDUCATION
- B.S., Agricultural Engineering
National Taiwan University, Taiwan - M.S., Geotechnical Engineering,
U.C. Berkeley
YEARS OF EXPERIENCE
- 22 years