Portfolio Category: Infrastructure

BART Earthquake Safety

BART Earthquake Safety Program (Seismic Retrofit Project), Bay Area, CA

Project Dates: 2000-2012 Client: Bay Area Rapid Transit (BART) Cost: $1.5 Billion Project Description: BART Earthquake Safety Program improved the system’s safety, ensured operability after a major earthquake, and preserved the vitality of a transportation system critical to the Bay Area’s quality of life and economic strength.  Retrofitting the core...
Read more

Route 12 Widening Project

Jameson Canyon, Route 12 Widening Project, Solano County

Project Dates: 1999 – 2012 Client: Solano Transportation Authority Cost: $115 Million Project Description: Project widened a 5.8-mile stretch of State Route 12 through Jameson Canyon Road from a two-lane highway to a four-lane highway. The project extends from Highway Route 12 from the Highway 29 and Highway 12 junction in Napa...
Read more

Norwood Avenue Bridge

Norwood Avenue Bridge and Roadway Realignment, Sacramento

Project Dates: 2007-2011 Client: City of Sacramento Cost: $10.8 Million Project Description: The project replaced the structurally deficient Norwood Avenue Bridge over Arcade Creek with a new bridge that meets current Caltrans standards. Construction included a new and higher concrete bridge with two travel lanes, bike lanes, sidewalks, street lighting and a...
Read more

Washington Boulevard

Washington Boulevard Overhead and Paseo Padre Parkway Underpass, Fremont, CA

Project Dates: 2001-2009 Client: Bay Area Rapid Transit (BART) and the City of Fremont Cost: $111 Million Project Description: The Washington Boulevard and Paseo Padre Parkway Project created new underpass and overhead structures across the alignment of Union Pacific Railroad and BART tracks.  The project included new embankments for...
Read more